The customer had a 802.11b/g WLAN site survey and installation two years ago with the finalservice performing as expected. Since that time, the customer has experienced modest customer growth while maintaining employee headcount. New wireless applications are being evaluated along with a possible temporary headcount increase, but the current WLAN performance has noticeable performance degradation. What is the most likely cause of the WLAN performance problems?
A. They have added a second microwave to the break room.
B. A new coffee shop with a wireless hotspot has opened across the street.
C. The customer has expanded their shipping capacity by 50%.
D. Employees are now using their smart phones and tablets in the office.
Answer: D
After having the kick-off meeting for a new site survey project with your customer, which three factors need to be considered prior to beginning a WLAN site survey? (Select three.)
A. Will an additional trip to the facility to perform the initial walkthrough be required?
B. How much time should be allocated to survey the locations for the controllers?
C. Will any additional regulatory or safety training be required to complete the site survey?
D. Is access available to all areas of the customer facility where the WLAN is planned to be deployed?
E. Which types of controllers and switches will be required to fully conduct the site survey in all areas of the customer facility?
F. Is access available to customer employees so that initial interviews can be performed?
Answer: A, C, D
No comments:
Post a Comment
Note: only a member of this blog may post a comment.